IKING GROUP-INSULATION AND ACOUSTIC SOLUTION FOCUS

Home Project International Project Onshore Gas Development Phase III (OGD-III) Project In U.A.E

International Project

Onshore Gas Development Phase III (OGD-III) Project In U.A.E

Onshore Gas Development Phase III (OGD-III) Project In U.A.E

Project Overview

The Onshore Gas Development Phase III (OGD-III) Project in the United Arab Emirates was strategically designed to process condensate-rich gas at Habshan, producing high-value Natural Gas Liquids (NGL) and condensate. As part of the advanced reservoir management strategy, residue gas is efficiently reinjected back into the reservoir to maintain critical operating pressures through gas cycling.

Project Specifications

Industry Sector Oil & Gas; Industrial Infrastructure
Service Area Industrial Pipe and Equipment Fire Insulation
Location Habshan, United Arab Emirates (U.A.E.)

ISOKING Supply & Production

To ensure optimal thermal efficiency, personnel protection, and high-standard passive fire protection across the facility, we supplied premium insulation materials tailored for harsh desert and high-stress industrial environments:

  • ISOKING Mineral Wool Blanket With Wire Mesh (WM): 650 Tons — Designed for high-temperature vessels and large-diameter piping, providing superior structural integrity and vibration resistance.
  • ISOKING Mineral Wool Pipes (PS): 1,700 m³ — Precision-molded pipe sections engineered for exceptional thermal insulation and fire safety on high-pressure gas pipelines.